All Products
-
Guava ManThe service provided was amazing. Fast delivery, quality 3D prints and really good price. Zoe was really helpful and understood my needs. Will be ordering more parts for our project soon!
-
JerryThe delivery time is quick, and very important: the products always sent match the order. I trust them because i've never been dispointed with them.
-
Manuel ProbstGood Support, fast Response....any problems will be solved quickly
Contact Person :
zoe
Phone Number :
86-18961109211
WhatsApp :
+8618961109211
Rapid Parts Silicone Prototype Manufacturers Vacuum Mold Casting Small Volume
Product Details
Micro Machining Or Not | Not Micro Machining | Material Capabilities | Aluminum, Brass, Bronze, Copper, Hardened Metals, Precious |
---|---|---|---|
File Format | Stp,step,x_t,stp | Processing | Silicone Mold |
Production Time | 3-5 Days | Certification | ISO9001 |
Surface Treatment | Painting,Polish, Texture, Etched | Application | Medical Equipments & Device Electronics, Electrical Device |
Name | Rapid Parts Silicone Prototype Manufacturers Vacuum Mold Casting Small Volume | Type | Vacuum Chamber Silicone Molding |
High Light | silicone prototype parts mingren,silicone mold vacuum casting,vacuum chamber silicone molding |
Product Description
Low Volume Production Vacuum Casting silicone molds low volume rapid prototype
Steps of silicone mold
1. Prototype: before making silicone mold, we need to make prototype. The prototype can be made of common ABS material and processed by CNC.
2. After the prototype of the silicone mold is ready, start making the silicone mold. Eight hours after drying, the silicone die cut open, take out the prototype. At this point, the silicone mold is ready.
3. Injection molding: inject the liquid gum material into the silica gel mold and dry it. The service life of silicone mold is about 25 mold times.
Advantage
Time is fast, cost is less, processing failure probability is small, etc. More than 20 same products can be made with a silicone mold. The cost, cycle and risk of product development are greatly reduced.
Technical Datas
Mould material | P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc.... |
Fast mould design | can be within 1-3 working days after getting customer's drawings |
Lead time | 3- 6 weeks after getting the mould design confirmation |
Mould testing | All of the moulds can be well tested before the shipments.Videos for testing the moulds are available. |
Minimum order | small orders can be accepted. |
Production capacity | 50 sets/month |
Port | Jiangsu |
Runner | Hot/cold |
Payment terms | L/C T/T Western Union Money Gram. |
Mould making service | OEM/ODM service available. |
After sales service | Available by our staff with more than 15 years of working experience in this field. |
Good packages | In strong wooden pallets to avoid any damages during the long transportation. |
Pictures


Recommended Products